PLANNING REPORT — THE SUBJECT SITE

Property at a Glance

FieldValue
Addressthe subject site
CouncilCity of Hobart
SchemeTasmanian Planning Scheme – State Planning Provisions + Hobart Local Provisions Schedule (effective 22 October 2025)
Title(lot/plan reference redacted)
Property ID (PID)(lot/plan reference redacted)
AreaTo be confirmed
ZonesInner Residential Zone (SPP 9.0); Open Space Zone (SPP 29.0); Utilities Zone (SPP 26.0) — property comprises land in all three zones
Code OverlaysCoastal Inundation Hazard Code (C11.0) – high, medium and low bands; Coastal Erosion Hazard Code (C10.0) – low band; Flood-Prone Areas Hazard Code (C12.0); Natural Assets Code (C7.0) – waterway and coastal protection area
TenureCouncil-owned land

The property is a large, council-owned parcel straddling three zones along the Derwent River foreshore in Sandy Bay. The full address and title are withheld. It is subject to multiple coastal and flood hazards, and its development capacity is constrained by its exposure to inundation, erosion, and natural asset protection requirements. The Inner Residential Zone portion offers the highest residential development potential if hazard thresholds can be met.

---

Planning Controls Applying

Zone 1: Inner Residential Zone (SPP 9.0)

Zone Purpose (clause 9.1): The Inner Residential Zone provides for a variety of residential uses at higher densities, efficient use of transport and service infrastructure, and non-residential uses that serve the local community without unreasonable loss of amenity. Use Table Summary (clause 9.2):
  • No Permit Required: Single dwellings only (within "Residential" use class); Passive Recreation; Natural and Cultural Values Management; minor Utilities (underground).
  • Permitted: Multiple dwellings (3+ on one lot); Visitor Accommodation; all other Residential uses not listed as NPR.
  • Discretionary: Business and Professional Services (consulting rooms, medical centres, residential support); Community Meeting and Entertainment (places of worship, community centres); Educational and Occasional Care (excluding tertiary); Food Services (excluding drive-through takeaway); General Retail and Hire; Sports and Recreation (fitness, gymnasium, pools, sports grounds); other Utilities.
  • Prohibited: All other uses.
Development Standards for Multiple Dwellings (clause 9.4):
StandardAcceptable Solution (A1)Performance Criterion (P1)
Density (9.4.1)Site area per dwelling ≥ 200 m².Density < 200 m²/dwelling if development contributes to range of dwelling types or significant social/community benefit.
Frontage Setback (9.4.2 A1)Primary frontage: ≥ 3 m (or existing dwelling setback if less); non-primary: ≥ 2 m (or existing if less).Setback compatible with streetscape, having regard to topography.
Garage/Carport Setback (9.4.2 A2)From primary frontage: ≥ 4 m, OR 1 m behind building line, OR 1 m if slope > 1 in 5.Setback compatible with existing garages/carports in street.
Building Envelope (9.4.2 A3)Envelope: 45° line from 3 m height at side/rear boundaries; max 9.5 m height; within 1.5 m of boundary only if does not exceed existing or ≤ 9 m length.Siting/scale must not cause unreasonable amenity loss to adjoining properties (sunlight, overshadowing, privacy, visual bulk).
Site Coverage (9.4.3 A1)≤ 65% (excl. eaves ≤ 0.6 m); for multiple dwellings, ≥ 40 m² private open space per dwelling.Site coverage consistent with established properties; private open space for outdoor recreation and operational needs.
Private Open Space (9.4.3 A2)Minimum 24 m² in one location (or 12 m² if floor > 1.8 m above ground); min horizontal dimension 4 m (or 2 m if elevated); gradient ≤ 1 in 10.Private open space to extend dwelling for relaxation, dining, entertaining; conveniently located; orientated for sunlight.
Sunlight to POS (9.4.4 A1)Dwelling north of another's POS: within 3 m + 45° line to 3 m height, OR ≥ 50% POS receives 3 hrs sunlight 9–3 pm on 21 June.No unreasonable overshadowing loss to same-site POS.
Garage Width (9.4.5 A1)Within 12 m of primary frontage: total opening width ≤ 6 m or ½ frontage width (whichever lesser).Minimise openings visible from street to reduce domination.
Privacy (9.4.6 A1, A2)Balcony/deck/parking > 1 m above ground: ≥ 1.7 m high screen (≤ 25% transparency) within 3 m side boundary / 4 m rear / 6 m from other dwelling's window/POS. Window/door > 1 m above ground to habitable room: ≥ 3 m side / ≥ 4 m rear / ≥ 6 m from other dwelling's window/POS.Screen or design to minimise overlooking of adjoining/same-site dwellings.
Waste Storage (9.4.8 A1)≥ 1.5 m² per dwelling: exclusive use area (not frontage) OR common area (≥ 4.5 m from frontage, ≥ 5.5 m from dwelling, screened to 1.2 m).Bins storable and screened from frontage/dwellings.

Zone 2: Open Space Zone (SPP 29.0)

Zone Purpose (clause 29.1): To provide land for open space purposes (passive recreation, natural/landscape amenity) and compatible uses supporting the zone. Use Table Summary (clause 29.2):
  • No Permit Required: Passive Recreation; Natural and Cultural Values Management; minor underground Utilities.
  • Permitted: None listed (no permitted use classes).
  • Discretionary: Community Meeting and Entertainment; Crematoria and Cemeteries (cemeteries only); Emergency Services; Food Services; General Retail and Hire; Pleasure Boat Facility; Resource Development (marine farming or grazing); Sports and Recreation; Tourist Operation; Transport Depot (wharves, water taxis); Utilities; Vehicle Parking; Visitor Accommodation (camping/caravan parks).
  • Prohibited: All other uses.
Development Standards (clause 29.4):
StandardAcceptable Solution (A1)Performance Criterion (P1)
Building Height (29.4.1 A1)≤ 10 m.Not cause unreasonable amenity loss to adjoining properties (sunlight, privacy, overshadowing, bulk/form).
Setback (29.4.1 A2)≥ 5 m from frontage OR existing buildings' max/min setbacks (whichever lesser).Compatible with streetscape; minimise crime/anti-social behaviour.
Side/Rear Setback (29.4.1 A3)From residential zone boundary: ≥ 3 m or ½ wall height (whichever greater).Not cause unreasonable amenity loss (overshadowing, privacy, visual bulk).
Outdoor Storage (29.4.2 A1)Not visible from road/public open space.Located, treated, or screened to minimise visual amenity impact.

Zone 3: Utilities Zone (SPP 26.0)

Zone Purpose (clause 26.1): To provide land for major utilities installations and corridors; other compatible uses if not adversely impacting the utility. Use Table Summary (clause 26.2):
  • No Permit Required: Passive Recreation; Natural and Cultural Values Management; minor Utilities.
  • Permitted: Recycling and Waste Disposal; Transport Depot and Distribution; Utilities (not listed as NPR); Vehicle Parking.
  • Discretionary: Emergency Services; Sports and Recreation; Storage; Tourist Operation.
  • Prohibited: All other uses.
Development Standards (clause 26.4): Building height ≤ 10 m (or ≤ 15 m for towers/poles); setback ≥ 5 m or existing building distance (whichever lesser); site coverage and outdoor storage must minimise visual impact.

---

Code Overlay 1: Coastal Inundation Hazard Code (C11.0)

Applicability: The property contains land in high, medium, and low coastal inundation hazard bands (reference: 114.11.29, 114.11.28, 114.11.27). Trigger: Use or development within a coastal inundation hazard area (clause C11.2.1). Use Standards (clause C11.5):
  • High band (C11.5.1 P1): No Acceptable Solution. Any use must rely on a coastal location (port/marine use, emergency services, utilities, open space) and a coastal inundation hazard report must demonstrate tolerable risk from a 1% annual exceedance probability (AEP) inundation event in 2100, OR no specific hazard reduction measures required.
  • Medium band (non-urban zone only) (C11.5.2 P1): Same reliance-on-coastal-location requirement (does not apply to residential).
  • Vulnerable uses (respite centres, residential care, assisted housing; Visitor Accommodation > 12 guests) (C11.5.4 P4): Must be protected from inundation in 2100, with evacuation plans, considering occupant ability to shelter/evacuate.
Development Standards (clause C11.6):
  • Buildings and works (C11.6.1 P1): Must have tolerable risk from 1% AEP event in 2100. A coastal inundation hazard report must demonstrate:
- Development does not cause/contribute to inundation on site, adjacent land, or public infrastructure. - Can achieve and maintain tolerable risk from 1% AEP event in 2100 without coastal protection works.
  • Coastal protection works (C11.6.2 P1): Kept to minimum; fit for purpose; do not increase inundation risk to adjacent land. Report must confirm no increased risk on adjacent land/public infrastructure and risks to 2100 can be mitigated. Cost arrangement for construction and maintenance required.
Subdivision (C11.7.1 A1): Each lot must be able to contain building area, vehicle access, and services wholly outside the inundation hazard area, OR for existing building separation, OR for public/utility purposes. (P1 adds merit test: not create opportunity for non-tolerable-risk use.) Practical Impact: Residential development (including dwellings) is not a "reliant-on-coastal-location" use in high or medium bands. In low bands, residential can proceed if tolerable risk demonstrated. Specialist coastal inundation hazard report required for any dwelling/habitable building use.

---

Code Overlay 2: Coastal Erosion Hazard Code (C10.0)

Applicability: The property contains land in low coastal erosion hazard band (reference: 114.10.23). Trigger: Use or development within a coastal erosion hazard area (clause C10.2.1). Use Standards (clause C10.5):
  • Low or medium band (non-urban zone) (C10.5.2 P1): Tolerable risk can be achieved having regard to increase in erosion risk, requirement for hazard reduction/protection, minimising reliance on coastal protection works, and advice in a coastal erosion hazard report.
  • Residential is not a "reliant-on-coastal-location" use, but can proceed if tolerable risk established under C10.5.2 P1.
Development Standards (clause C10.6):
  • Buildings and works (C10.6.1 P1): Tolerable risk required. Report must demonstrate:
- Does not cause/contribute to erosion on site, adjacent land, or public infrastructure. - Can achieve and maintain tolerable risk from 2100 erosion event without coastal erosion protection works.
  • Coastal protection works (C10.6.2 P1): Kept to minimum; if within non-urban zone, for coastal-reliant use; report confirms no increased erosion risk on adjacent land/public infrastructure.
Subdivision (C10.7.1 A1): Building area, vehicle access, and services must be wholly outside hazard area, OR existing building separation, OR public/utility purposes. Practical Impact: Combined with CIHC, the property requires detailed coastal hazard assessment (erosion + inundation) to establish whether residential development can tolerate 2100-horizon coastal risk.

---

Code Overlay 3: Flood-Prone Areas Hazard Code (C12.0)

Applicability: The property is within a flood-prone hazard area (reference: 114.12.30). Trigger: Development or change of use that converts non-habitable to habitable building, or new habitable room (clause C12.2.2). Use Standards (clause C12.5):
  • Habitable building/room (C12.5.1 P1): Must have tolerable risk from 1% AEP flood event. Flood hazard report must demonstrate:
- Increase in flood risk does not require specific hazard reduction/protection, OR - Use can achieve and maintain tolerable risk from 1% AEP flood event without flood protection measures.
  • Vulnerable uses (residential care, assisted housing, Visitor Accommodation > 12 guests) (C12.5.2 P4): Must be protected from flood; occupants must be able to shelter/evacuate; emergency plan required.
Development Standards (clause C12.6):
  • Buildings and works (C12.6.1 P1): Type, form, scale, and duration must achieve and maintain tolerable risk from 1% AEP flood event. Report must demonstrate development does not cause/contribute to flood on site, adjacent land, or public infrastructure.
Subdivision (C12.7.1 A1): Building area, vehicle access, and services must be wholly outside flood-prone hazard area, OR existing building separation, OR public/utility purposes. Practical Impact: Flood hazard report required for any new habitable building or room. Combined with coastal hazards, this substantially constrains ground-floor habitable development unless elevated or protected.

---

Code Overlay 4: Natural Assets Code (C7.0)

Applicability: The property contains land within a waterway and coastal protection area (reference: 114.7.16). For the Inner Residential Zone portion, any Class 4 watercourse within or adjoining the zone is deemed Class 4 (clause C7.3.1 Table C7.3(b)). Trigger: Development (not use) within the waterway and coastal protection area (clause C7.2.1–C7.2.2). Development Standards (clause C7.6.1):
  • A1 (Buildings and works in waterway/coastal protection area): Must be within a building area on a sealed plan, OR for Class 4 watercourse, a crossing/bridge ≤ 5 m width, OR within tidal waters, extension to existing boat ramp/jetty/marina ≤ 20% of existing area.
  • P1.1: Avoid or minimise adverse impacts on natural assets (riparian vegetation, natural streambank condition, fish passage, wetland filling, coastal processes, sand movement). Design to respond to topography; minimise cut/fill; follow Wetlands and Waterways Works Manual and Tasmanian Coastal Works Manual.
  • P1.2 (Tidal waters): Use must rely on coastal location (resource access, marine infrastructure, essential utility, open space/marine-educational/recreational facilities).
  • A3: No new stormwater point discharge into watercourse/wetland/lake. P3: If discharge proposed, avoid/minimise impacts on water quality, erosion, sedimentation, runoff.
  • A4/P4: Dredging/reclamation minimise impacts on coastal processes and natural assets.
  • A5/P5: Coastal protection works designed by qualified person; minimise impacts on coastal processes and sand movement.
Practical Impact: Any development within the waterway/coastal protection area (approximately the foreshore strip) will require specialist environmental assessment and compliance with natural assets standards. Building areas should be located outside the waterway/coastal protection area where possible (clause C7.6.1 P1.1).

---

Development Capacity

The property's development capacity is substantially constrained by its exposure to coastal hazards (inundation, erosion) and flood risk, combined with natural asset protection and waterway setbacks. The following is feasible under the planning scheme if specialist assessments establish tolerable risk:

Inner Residential Zone Portion

Permitted Development Type: Multiple dwellings (3 or more dwellings on one lot). Density Threshold:
  • Acceptable Solution: ≥ 200 m² site area per dwelling (cluster of dwellings across the site area if unconstrained).
  • Performance Criterion: Lower density permissible if development contributes to range of dwelling types or significant social/community benefit (e.g. mixed-tenure, affordable housing).
Realistic Yield (assuming hazard assessments pass and zoned land is developable):
  • Scenario A (conservative): 20–40 dwellings. This assumes:
- Large proportion of site unsuitable for habitable development due to high/medium inundation hazard, flood risk, or waterway setback. - Dwellings elevated or on flood-resilient plinths to achieve 1% AEP tolerable risk. - Setbacks and private open space standards met (40 m² per dwelling minimum). - Parking and refuse storage per C2.5 Parking and Sustainable Transport Code.
  • Scenario B (optimistic): 40–80 dwellings. Assumes:
- More of site is in low-hazard or lower-risk areas. - Design incorporates accepted flood/inundation protection measures. - Development contributes to housing diversity (density > 200 m²/dwelling argued via P1). Assessment Pathway: Permitted, provided all Acceptable Solutions (A1–A8 of clause 9.4) are satisfied, OR Discretionary if Performance Criteria (P1–P3) must be relied upon for:
  • Density < 200 m²/dwelling.
  • Setbacks outside streetscape pattern.
  • Site coverage > 65%.
  • Building envelope/siting impacts on adjoining amenity.
  • Hazard resilience (inundation, erosion, flood).
Hazard Overlay Pathway: Regardless of zone status, any dwellings must satisfy:
  • Coastal Inundation Hazard Code (C11.0) – P1 of C11.6.1: coastal inundation hazard report demonstrating tolerable risk in 1% AEP 2100 event.
  • Coastal Erosion Hazard Code (C10.0) – P1 of C10.5.2 or C10.6.1: coastal erosion hazard report demonstrating tolerable risk in 2100 event.
  • Flood-Prone Areas Hazard Code (C12.0) – P1 of C12.5.1 or C12.6.1: flood hazard report demonstrating tolerable risk in 1% AEP flood event.
  • Natural Assets Code (C7.0) – P1.1 of C7.6.1: development must avoid or minimise impacts on riparian/littoral vegetation, streambank condition, coastal processes; must comply with Wetlands and Waterways Works Manual; must maintain fish passage if applicable.

Open Space Zone Portion

Permitted Development Type: Only Discretionary uses (no Permitted uses listed in clause 29.2). Community Meeting and Entertainment, Food Services, Tourist Operation, etc. require permits and merit assessment. Residential Development: Not permissible in Open Space Zone (not listed in Use Table). Prohibited. Realistic Yield: 0 dwellings (unless zone boundary adjustment sought via Local Provisions Schedule amendment).

Utilities Zone Portion

Permitted Development Type: Utilities, Recycling/Waste, Transport Depot, Vehicle Parking. Residential Development: Not permissible. Prohibited. Realistic Yield: 0 dwellings (unless zone boundary adjustment sought).

---

Pathway Analysis

Most Likely Project: Multiple Dwellings on Inner Residential Zone Land

Assumed Project: A mixed-tenure apartment/townhouse development, 30–50 dwellings, incorporating flood resilience and coastal hazard management. Assessment Pathway (under LUPAA § 57–58 and SPP clause 6.0):

#### Step 1: Categorise the Use

Use Class: Residential – multiple dwellings (Table 6.2; clause 9.2 for Inner Residential Zone). Status in Inner Residential Zone: Permitted (clause 9.2, Use Table: "Residential – If not listed as No Permit Required" = multiple dwellings).

#### Step 2: Development Category

If all Acceptable Solutions met (density ≥ 200 m²/dwelling, setbacks within streetscape, site coverage ≤ 65%, private open space ≥ 40 m²/dwelling, waste storage compliant, building envelope within 9.5 m and 45° line, no breaches of codes' Acceptable Solutions):

  • Development Category: Permitted (clause 6.7.1 and 6.7.2).
  • Permit Status: Must be granted (clause 6.7.1(a)–(d)).
If Performance Criteria relied upon (density < 200 m²/dwelling, or setback/coverage/height/privacy/amenity reliance, or hazard report showing tolerable risk but not no-risk):
  • Development Category: Discretionary (clause 6.8.1(b)).
  • Permit Status: Council has discretion to refuse or approve under merit assessment (clause 6.8.1).
#### Step 3: Statutory Timeframe & Public Notification

If Discretionary:
  • Public Notification: Yes, 14-day representation period required (LUPAA § 57(5)).
  • Statutory Timeframe: 42 days from receipt of complete application (LUPAA § 57(5A)), or longer if applicant agrees.
  • Council Authority: City of Hobart planning authority.
If Permitted:
  • Public Notification: No.
  • Statutory Timeframe: 10 working days (LUPAA § 57(1A)), or as agreed.
#### Step 4: Mandatory Agency Referrals TasWater (water / sewer servicing):
  • Confirm water supply and reticulated sewer available to site.
  • Likely: on-site stormwater management plan required (C12.0 Stormwater Code; clause C12.0 addresses development standards for stormwater).
TasNetworks (electricity):
  • Overhead powerline easement or underground cable assessment.
  • If any overhead lines cross site, clearance/relocation may be required.
EPA (if a Level 2 Activity):
  • Development in flood-prone/coastal hazard area with 5+ dwellings may trigger Environmental Effects Act 1993 assessment if change of use or intensity.
  • Status to be confirmed with EPA early in application.
Heritage Tasmania (if Local Heritage applies):
  • The property does not appear to be within a Local Historic Heritage Code overlay (not listed in Hobart LPS appendix).
  • Confirm via TheList (LIST.tas.gov.au) to check for any listed heritage place.
Accredited Bushfire Practitioner or TasFire (if Bushfire-Prone Areas Code applies):
  • Property is not listed as being within a bushfire-prone area in the supplied code overlay data.
  • Confirm via council bushfire hazard map; if triggered, Bushfire Hazard Management Plan and BAL rating required.
Crown Land Services (if abutting Crown land):
  • The property is council-owned. If subdivision proposed, check for restrictions or reservations.
#### Step 5: Specialist Reports Required Mandatory:

1. Coastal Inundation Hazard Report (C11.0, clause C11.3.1 definition; clause C11.6.1 P1.2): - Prepared by suitably qualified person (coastal engineer or equivalent). - Must demonstrate development can achieve and maintain tolerable risk from 1% AEP coastal inundation event in 2100 without requiring coastal protection works. - Required for any habitable building (dwellings) in high, medium, or low inundation hazard bands (property is in all three). - Budget: $15,000–$25,000.

2. Coastal Erosion Hazard Report (C10.0, clause C10.3.1 definition; clause C10.6.1 P1.2): - Prepared by geotechnical practitioner (engineer-civil, geotechnical engineer, or engineering geologist per clause C10.3.1). - Must confirm development does not cause/contribute to coastal erosion and can achieve and maintain tolerable risk from 2100 erosion event without coastal protection works. - Required for low erosion hazard band developments. - Budget: $15,000–$25,000.

3. Flood Hazard Report (C12.0, clause C12.3.1 definition; clause C12.6.1 P1.2): - Prepared by suitably qualified person (hydraulic engineer, environmental engineer). - Must demonstrate development does not cause/contribute to flood on site/adjacent land/public infrastructure and can achieve and maintain tolerable risk from 1% AEP flood event without flood protection measures. - Required for any new habitable building/room in flood-prone hazard area. - Budget: $12,000–$20,000.

4. Site Survey (AHD levels, boundaries, existing/proposed contours): - To support above reports and setback/height compliance. - Budget: $3,000–$6,000.

5. Stormwater Management Plan (C12.0 – Stormwater Code; SPP General Provisions if applicable): - Rational method hydrology; on-site detention/retention; no new point discharge into watercourse/wetland (clause C7.6.1 A3). - Budget: $8,000–$15,000.

Highly Likely:

6. Natural Assets / Ecological Assessment (C7.0, clause C7.6.1 P1.1–P1.2): - Riparian/littoral vegetation survey; potential fish passage survey. - Demonstrates building areas located outside waterway/coastal protection area where practicable. - Compliance with Wetlands and Waterways Works Manual and Tasmanian Coastal Works Manual. - Budget: $10,000–$18,000.

7. Landscape/Urban Design Plan (clause 9.4.2 P1 and 9.4.3 P1): - Site layout, streetscape, private open space, gardens, landscaping. - Demonstrates compatibility with Inner Residential streetscape; privacy and sunlight compliance; waste storage screening. - Budget: $5,000–$12,000.

8. Arboricultural Impact Assessment (if any significant trees): - Unlikely to apply unless existing trees within development footprint. - Budget (if required): $3,000–$8,000.

Total Specialist Costs: ~$71,000–$129,000 (before design fees, engineering, construction).

#### Step 6: Likely Conditions (if Permitted granted)

  • Conditions to require approved Stormwater Management Plan before construction.
  • Conditions to require finished floor levels set above 1% AEP flood level (+ freeboard, typically 0.5 m).
  • Conditions requiring compliance with coastal hazard report recommendations (if coastal protection works proposed, cost-sharing arrangement with council).
  • Conditions requiring protection of riparian vegetation during construction (C7.0).
  • Conditions regarding removal of invasive vegetation if present.
  • Conditions regarding archaeological survey (unlikely unless known Indigenous heritage).
  • Parking spaces and design per C2.5 Parking and Sustainable Transport Code (likely 1.5–2 spaces per dwelling).
---

Recommended Next Steps

1. Pre-Application Discussion with City of Hobart Planning

Action: Arrange a formal pre-application meeting with the council planning authority (contact: City of Hobart Planning Services, planning@hobartcity.com.au or (03) 6238 2711). Topics to Discuss:
  • Zone status (confirm Inner Residential portion can support 30–50 dwellings).
  • Coastal hazard constraints: council's prior experience assessing inundation/erosion risk for foreshore sites.
  • Flood risk: confirm if site is within a mapped flood-prone area and council's acceptance of elevated/flood-resilient design.
  • Natural assets: riparian setbacks; whether any part of the waterway/coastal protection area can accommodate building.
  • Parking and servicing: confirm TasWater's capacity for sewer/water; off-street parking requirement under C2.5.
  • Indicative timeline and likely referrals.
  • Whether a Permit with conditions is more likely than a Discretionary merit assessment.
Timeline: 2–3 weeks.

---

2. Commission Specialist Reports (in parallel with pre-app meeting)

Coastal Inundation Hazard Report:
  • Engage a coastal engineer or hydraulic engineer experienced in TAS coastal hazard assessment.
  • Request scope confirming:
- AHD survey of proposed building footprints. - 1% AEP inundation level for 2025 and 2100 (including sea-level rise per latest guidance, e.g. IPCC RCP 8.5 or equivalent). - Finished floor level recommendations. - Whether elevated/plinths or other resilience measures can achieve tolerable risk. - Identification of any coastal protection works required (and implications for cost).
  • Timeline: 8–12 weeks from brief to final report.
Coastal Erosion Hazard Report:
  • Engage a geotechnical engineer or engineering geologist with coastal erosion experience.
  • Request:
- Site investigation (boring, lab testing per AS 1726-2017). - Long-term erosion rates (historical + projected to 2100). - Setback from actively mobile landforms. - Whether development can be sited outside erosion risk zones. - Confirmation that no coastal protection works required.
  • Timeline: 10–14 weeks.
Flood Hazard Report:
  • Engage a hydraulic engineer or environmental engineer.
  • Request:
- Catchment hydrology; 1% AEP peak flow for 2025 and 2100. - Flood level at site for various AEP events (10%, 1%, 0.2%). - Freeboard recommendations (typically 0.5 m above 1% AEP). - Site layout to confirm FFL above 1% AEP + freeboard. - Confirmation of no net increase in flood risk to adjacent land.
  • Timeline: 8–12 weeks.
Parallel Commissions (to save time):
  • Site Survey: Engage surveyor immediately to capture AHD levels, boundaries, contours. Both coastal and flood engineers will need this. (3–4 weeks.)
  • **

Sources & legislation

Every claim in this report is grounded in the following authoritative documents. Click any link to open the in-force version directly.

  • LUPA Act 1993 &mdash; Land Use Planning and Approvals Act 1993 (Tasmania) — Primary statute. Establishes the Tasmanian Planning Scheme, planning permits, and the No Permit Required / Permitted / Discretionary / Prohibited categories.
  • State Planning Provisions &mdash; Tasmanian Planning Scheme — State Planning Provisions (SPP) — State-wide planning controls. Zones, codes and general provisions that apply across all transitioned councils.
  • Tasmanian Planning Policies &mdash; Tasmanian Planning Policies 2023 — State-level policy framework. Provides the strategic direction the SPP and LPS must align with.
  • iPlan Tasmania &mdash; iPlan Tasmania — Statutory Planning Maps — Authoritative source for the in-force TPS / TIPS map layers, zone boundaries and code overlay extents.
  • Parking & Sustainable Transport Code &mdash; Tasmanian Planning Scheme — Parking and Sustainable Transport Code (C2.0) — Code C2.0 of the SPP. Applies almost universally — sets minimum parking, bicycle parking and end-of-trip standards.
  • Coastal Inundation Hazard Code &mdash; Tasmanian Planning Scheme — Coastal Inundation Hazard Code (C11.0) — Code C11.0 of the SPP. Triggers when the property is mapped within a coastal-inundation hazard band; controls minimum floor levels and habitable-room siting.
  • Building Act 2016 &mdash; Building Act 2016 (Tasmania) — Building approvals and the National Construction Code (NCC) — runs in parallel to the planning permit pathway.
  • TASCAT &mdash; Tasmanian Civil and Administrative Tribunal — Resource Management and Planning Appeal Stream — Appeal jurisdiction for planning permit refusals, conditions, and third-party appeals against discretionary applications.

Get this report for your property