Sample report — illustrative only

This is a real SA Residential Planning Report our engine generated for a demo property (Sample single dwelling — SA (identifiers redacted)). Your report will be specific to your address, zone and proposal.

SA · Sample SA Residential Planning Report

Planning Report — Single Dwelling (SA)

Demo property: Sample single dwelling — SA (identifiers redacted)

SA Planning Report — the subject site

Property at a glance

FieldDetails
Addressthe subject site
Title(lot/plan reference redacted)
Lot(lot/plan reference redacted)
CouncilCity of West Torrens
ZoneGeneral Neighbourhood Zone (GN)
SubzoneNone
OverlaysAirport Building Heights (Regulated) — All structures over 15 metres; Prescribed Wells Area; Regulated and Significant Tree
Technical & Numeric Variations (TNVs)None listed
Planning & Design Code VersionVersion 2026.8 (30 April 2026)
Assessment PathwayCode Assessed — Deemed-to-Satisfy (single dwelling) or Code Assessed — Performance Assessed (departure from DTS criteria)

The property is a single residential allotment in the General Neighbourhood Zone, subject to three overlays. The Airport Building Heights overlay limits structures over 15 metres (affecting multi-storey buildings only); the Prescribed Wells Area overlay requires sustainable water-supply planning; the Regulated and Significant Tree overlay triggers tree-retention assessment if regulated or significant trees are present on or near the site.

---

Planning controls applying

General Neighbourhood Zone (GN)

Desired Outcome (DO 1): "Low-rise, low and medium-density housing that supports a range of needs and lifestyles located within easy reach of services and facilities. Employment and community service uses contribute to making the neighbourhood a convenient place to live without compromising residential amenity."

The zone contemplates a mix of residential dwellings (detached, semi-detached, row, group dwellings, residential flat buildings) and small-scale complementary uses (shops, offices, community facilities, ancillary accommodation). Development is predominantly low-rise and low to medium density, with the greatest intensity near public open space and transport nodes.

Key Performance Outcomes and DTS/DPF Criteria:
ControlCriterionRequirement
Land UsePO 1.1, DTS/DPF 1.1Residential use (dwelling) or a small-scale complementary use meeting the specified definitions in DTS/DPF 1.1
Site Area & Frontage (Single Dwelling)PO 2.1, DTS/DPF 2.1Minimum site area: 300 m² (exclusive of battle-axe handle); Minimum frontage: 9 m (not on a battle-axe site) or 5 m (on a battle-axe site)
Site CoveragePO 3.1, DTS/DPF 3.1Building footprint not exceeding 60% of site area
Building HeightPO 4.1, DTS/DPF 4.12 building levels maximum; 9 m maximum (excluding garages, carports, outbuildings); wall height ≤7 m (excluding gable)
Primary Street SetbackPO 5.1, DTS/DPF 5.1Setback determined by the average of abutting buildings minus 1 m, or 5 m if no abutting buildings; exact figure depends on context and survey
Secondary Street SetbackPO 6.1, DTS/DPF 6.1Setback ≥900 mm or the distance of an existing building on an adjacent property, whichever is greater
Side Boundary WallPO 8.1, DTS/DPF 8.1Where wall height ≤3 m: setback ≥900 mm; where wall height >3 m and south-facing: setback ≥1.9 m + 1/3 of excess height above 3 m from footing
Rear Boundary WallPO 9.1, DTS/DPF 9.1Where wall height ≤3 m: setback ≥900 mm; where wall height >3 m and south-facing: setback ≥1.9 m + 1/3 of excess height above 3 m from footing
Ancillary BuildingsPO 11.1, DTS/DPF 11.1Floor area ≤60 m² (site ≤500 m²) or ≤80 m² (site >500 m²); wall height ≤3 m; positioned behind building line and away from street frontage
Private Open SpacePO 17.1, DTS/DPF 17.1Ground-level dwelling: minimum 24 m² (≥3 m dimension, directly accessible from a living room) per Design in Urban Areas Table 1
Car ParkingPO 19.1–19.6Residential dwelling: 1 space required per Transport, Access and Parking Table 1 (to be confirmed for the locality); setback ≥5.5 m from primary street boundary; width 3.0–3.2 m

---

Airport Building Heights (Regulated) Overlay

Desired Outcome (DO 1): "Management of potential impacts of buildings and generated emissions to maintain operational and safety requirements of registered and certified commercial and military airfields, airports, airstrips and helicopter landing sites." Qualifier: "All structures over 15 metres" — this overlay applies only to buildings that exceed 15 metres in height. Key Control:
ControlCriterionRequirement
Building HeightPO 1.1, DTS/DPF 1.1Buildings >15 m in height must not exceed the height specified in the Airport Building Heights (Regulated) Overlay boundary on the SA Property and Planning Atlas. The lowest applicable height value applies where the site falls within multiple overlay zones.
Practical effect: A single dwelling (2 storeys, ≤9 m per GN zone DTS/DPF 4.1) does not trigger this overlay — it falls entirely within the "All structures" zone (no height limit applies to structures ≤15 m). The overlay is not engaged for a standard residential dwelling.

---

Prescribed Wells Area Overlay

Desired Outcome (DO 1): "Sustainable water use in prescribed wells areas." Key Control:
ControlCriterionRequirement
Water SupplyPO 1.1, DTS/DPF 1.1Development must have a lawful, sustainable and reliable water supply that does not place undue strain on water resources in the prescribed wells area.
Practical effect for a single dwelling: A dwelling connected to mains water supply (City of West Torrens reticulation) will satisfy DTS/DPF 1.1 (sustainable and reliable supply via the reticulated system). No additional specialist report required if mains water is available. If on-site bores or alternative water sources are proposed, engagement with the Department for Environment and Water (DEW) is advisable to confirm the proposal does not breach the overlay's intent.

---

Regulated and Significant Tree Overlay

Desired Outcome (DO 1): "Conservation of regulated and significant trees to provide aesthetic and environmental benefits and mitigate tree loss." Key Controls:
ControlCriterionRequirement
Tree RetentionPO 1.1, DTS/DPF 1.1; PO 1.2, DTS/DPF 1.2Regulated trees (listed on council's register or meeting Code DBH thresholds: typically ≥200 mm diameter at breast height) and Significant trees (heritage / ecological value) must be retained where they contribute to the character of the area and do not impede development. DTS/DPF criteria are not specified — assessment defaults to Performance Outcome merit.
Tree-Damaging ActivityPO 1.3, PO 1.4, DTS/DPF 1.3, DTS/DPF 1.4Removal, lopping, pruning, root damage, or excavation within the Tree Protection Zone (typically 5–10 m radius) requires consent. DTS/DPF criteria are not specified — assessment defaults to Performance Outcome merit.
Groundwork Near TreesPO 2.1, DTS/DPF 2.1Excavation or filling within the vicinity of regulated/significant trees must not unduly compromise the tree's root system. DTS/DPF not specified — Performance Outcome merit assessment applies.
Practical effect for this property: An arborist's assessment is required at pre-lodgement to confirm whether regulated or significant trees are present on the site or within the Tree Protection Zone. If trees are identified, removal or damage may be refused unless justified by site constraints (e.g., disease, safety hazard, structural conflict). If trees will be retained, the dwelling design must accommodate the Tree Protection Zone (typically no excavation, sealed surfaces, or building within 5–10 m radius of the tree base).

---

Design in Urban Areas General Development Policies (Part 4)

The following Part 4 provisions also apply to all development, including a single dwelling:

ControlCriterionKey Requirement
Private Open SpaceDesign in Urban Areas Table 1Ground-level dwelling: 24 m² minimum with ≥3 m minimum dimension, directly accessible from a living room (applies to single dwelling)
Decks (if proposed)PO 33.1–33.3, DTS/DPF 33.1–33.3Decks ≤900 mm set back from side/rear boundaries; ≥2 m from residential boundaries; ≤25 m² floor area; ≤1 m above natural ground level (unless residential use with screening)
Car ParkingTransport, Access and Parking Table 11 space required for a dwelling; 5.4 m minimum length, 3.0 m minimum width (enclosed) or 2.4 m width (uncovered)

---

Development capacity

Single Detached Dwelling

Zoning permit:Yes — a single dwelling is the primary use in the General Neighbourhood Zone (PO 1.1, DTS/DPF 1.1). Site requirements (DTS/DPF 2.1):
  • Minimum site area: 300 m² (the actual measured site area must be confirmed by title/survey)
  • Minimum frontage: 9 m (measured at the street boundary; if the site is a battle-axe allotment, minimum 5 m applies to the battle-axe "handle")
Built-form envelope (DTS/DPF):
  • Height: 2 storeys, maximum 9 m (9 m measured from natural ground level to the highest point of the roof, excluding guttering; gable ends and wall height capped at 7 m)
  • Site coverage: Maximum 60% (DTS/DPF 3.1)
  • Primary street setback: Determined by abutting buildings (average minus 1 m) or 5 m if no abutting context (DTS/DPF 5.1) — survey of neighbouring setbacks required
  • Secondary street setback: ≥900 mm or match existing neighbour (DTS/DPF 6.1)
  • Side boundary: ≥900 mm (if wall ≤3 m) or 1.9 m + 1/3 excess (if south-facing and >3 m)
  • Rear boundary: ≥900 mm (if ≤3 m) or 1.9 m + 1/3 excess (if south-facing and >3 m) — note: site >301 m² requires 4 m ground-floor setback, 6 m upper-level (DTS/DPF 8.1)
  • Private open space: Minimum 24 m² directly accessible from living room with ≥3 m dimension
  • Ancillary buildings: Maximum 80 m² (site >500 m²) or 60 m² (site ≤500 m²), wall height ≤3 m, setback ≥5.5 m from primary street
Assessment pathway:
  • If the dwelling complies with all DTS/DPF criteria: Deemed-to-Satisfy (Code Assessed) — no consent required; council must approve if application is complete. No public notification.
  • If the dwelling departs from any DTS/DPF criterion (e.g., exceeds 9 m height, <900 mm side setback, <24 m² private open space): Code Assessed — Performance Assessed — merit-based assessment against Performance Outcomes (PO 4.1, PO 8.1, PO 17.1, etc.); public notification typical; refusal possible.
Airport overlay impact: Not engaged (single dwelling ≤9 m, well below 15 m threshold). Prescribed Wells Area overlay: No material impact if mains water connected (DTS/DPF 1.1 satisfied). Significant Tree overlay: Must assess at pre-lodgement. If trees present, removal will likely be Performance Assessed; retention is preferred (PO 1.1, PO 1.2).

Dual Occupancy / Semi-Detached Dwellings

Zoning permit:Yes — semi-detached dwellings are listed in DTS/DPF 1.1. Additional site requirements (DTS/DPF 2.1):
  • Minimum site area per dwelling: 300 m² (total minimum 600 m² for two units on one allotment)
  • Minimum frontage: 9 m (total frontage requirement depends on subdivision context)
Built-form: Same height, coverage, and setback rules apply as single dwelling. Assessment pathway: Code Assessed — Deemed-to-Satisfy or Performance Assessed (depending on DTS/DPF compliance). Realistic capacity: A 600–800 m² site can accommodate dual occupancy if compliance with DTS/DPF is met (height, coverage, setbacks, private open space per unit).

Row Dwellings / Terrace Houses

Zoning permit:Yes — row dwellings are listed in DTS/DPF 1.1. Site requirements (DTS/DPF 2.1):
  • Minimum site area per dwelling: 250 m²
  • Minimum frontage: 7 m averaged across the row
Built-form: Same height and coverage rules; shared side boundaries typically have 900 mm setback or abutting wall (DTS/DPF 7.2 — side boundary walls in semi-detached, row, or terrace arrangements set back ≥900 mm from boundaries outside the development site). Assessment pathway: Code Assessed — Deemed-to-Satisfy or Performance Assessed (depending on compliance). Realistic capacity: A 500–600 m² site can accommodate 2–3 row dwellings if DTS/DPF criteria met.

Group Dwellings / Residential Flat Buildings

Zoning permit:Yes — group dwellings and residential flat buildings are listed in DTS/DPF 1.1. Site requirements (DTS/DPF 2.1):
  • Minimum site area: 300 m² average (including common areas)
  • Minimum frontage: 15 m total
Built-form: Same height (9 m) and coverage (60%) rules; private open space per Design in Urban Areas Table 1 (studio/1 bed: 4–8 m²; 2 bed: 11 m²; 3+ bed: 15 m²); communal open space per Table 2 (25 m² + 4 m² per dwelling above 5, up to 250 m² total). Assessment pathway: Code Assessed — Performance Assessed (group dwellings and flats typically depart from single-dwelling DTS/DPF norms around private open space, parking, and common-area design; merit-based assessment of POs 17.1, 22.1–22.10, 23.1–23.8 required). Realistic capacity: A 600–800 m² site can accommodate 2–3 units as a group dwelling if common open space, parking, and amenity standards are met.

---

Pathway analysis

Most Likely Project: Single Detached Dwelling (New Build or Renovation with Addition)

#### Assessment Classification

Use class: Dwelling (single residential occupancy, ancillary car parking and private open space). Code Assessed — Deemed-to-Satisfy pathway (if DTS/DPF criteria met):
  • Development comprises: dwelling + garage/carport + private open space (PO 1.1, DTS/DPF 1.1).
  • Site area: if ≥300 m², satisfies DTS/DPF 2.1.
  • Frontage: if ≥9 m, satisfies DTS/DPF 2.1.
  • Height: if ≤9 m (2 storeys), satisfies DTS/DPF 4.1.
  • Coverage: if ≤60%, satisfies DTS/DPF 3.1.
  • Setbacks: if setbacks comply with DTS/DPF 5.1, 6.1, 8.1, 9.1, satisfies those criteria.
  • Private open space: if ≥24 m² with ≥3 m dimension, directly accessible from living room, satisfies DTS/DPF 17.1.
  • Car parking: if 1 space provided, setback ≥5.5 m from street, 3.0–3.2 m width, satisfies DTS/DPF 19.1–19.6.
  • Ancillary buildings: if ≤80 m² (site >500 m²) or ≤60 m² (site ≤500 m²), wall height ≤3 m, setback ≥5.5 m from primary street, satisfies DTS/DPF 11.1.
If all DTS/DPF criteria are met: Consent granted by delegation. No public notification. Processing time: 10–15 business days (if no referrals triggered). Planner signs off. Code Assessed — Performance Assessed pathway (if DTS/DPF criteria not met):
  • Departs from one or more DTS/DPF criteria (e.g., height 10 m, side setback 700 mm, private open space 20 m², site area 280 m²).
  • Assessment against corresponding Performance Outcomes (PO 4.1, PO 8.1, PO 17.1, etc.) on merit.
  • Public notification triggered if material departures (typically notification period 10 business days; representations considered by council).
  • Council Assessment Panel (CAP) or delegate decision, depending on representation complexity.
  • Processing time: 20–30 business days (if no major submissions; longer if CAP referral).
  • Refusal possible if POs cannot be satisfied.
#### Relevant Authority City of West Torrens (council delegate or Council Assessment Panel, depending on notification outcome).

#### Agency Referrals (Section 9.1 Referrals Schedule)

Standard referrals under Part 9.1 (Referrals) for a single dwelling in the General Neighbourhood Zone:

AgencyTriggerTypical Outcome
DIT (Department for Infrastructure & Transport)If access to a State-Maintained Road (likely for the subject site if arterial); or if the proposal impacts a public road reserveCheck whether the subject site is state-managed. If so, DIT clearance required. If not, no referral.
EPA (Environment Protection Authority)Wastewater (on-site septic) or noise-generating activityNot engaged for a standard dwelling with reticulated sewerage. No referral.
SA WaterWater supply or sewerage connection (reticulated systems)Standard condition; no consent-stage referral typically required.
Heritage SAState Heritage Place or Historic Area overlay (none listed for this property)Not engaged. No referral.
CFS (Country Fire Service)Bushfire Hazard overlay (not listed for this property)Not engaged. No referral.
NVC (Native Vegetation Council)Native Vegetation Clearance (not applicable to urban residential)Not engaged. No referral.
Regulated/Significant Tree overlayTree-damaging activity on a regulated or significant treeReferral required IF trees are identified by arborist. If trees present: council may refer to DEW or heritage specialist for assessment.

#### Public Notification

Deemed-to-Satisfy: No notification (ministerial exemption applies; s 114 PDI Act). Performance Assessed: Public notification (10 business days minimum, per s 112 PDI Act). Representations invited from interested parties. If no representations received, or if representations support the proposal, council may delegate decision. If representations oppose, CAP determination may be required.

#### Specialist Reports Likely Required

Report TypeTriggerCost (est.)Timing
Arborist AssessmentRegulated/Significant Tree overlay applies; survey required to confirm tree presence/location$500–$1,200Pre-lodgement (2–3 weeks)
Site SurveyConfirm site area, frontage, slope, tree locations, existing setbacks of abutting buildings$1,500–$2,500Pre-lodgement (1–2 weeks)
Geotechnical ReportSloping land (>1 in 8 gradient) or unstable soil (if observed); not typically required for flat urban sites$2,500–$5,000Pre-lodgement (3–4 weeks) if needed
Traffic & Access ReportIf access is shared, or if primary street has high traffic volumes; usually not required for a single dwelling$1,500–$3,000Not usually required
Building Design/PlansStandard architectural/engineer drawings (floor plan, elevations, sections, site plan with dimensions, levels, materials schedule)$2,000–$5,000 (architect)Pre-application (4–6 weeks)

#### Processing Timeline

MilestoneTimeframe
Pre-lodgement advice from council1–2 weeks
Arborist + survey (if required)2–4 weeks
Architectural design4–6 weeks
Lodgement (complete application)Week 7–8
DTS pathway: consent issued10–15 business days
Performance Assessed (no representations): consent issued20–25 business days
Performance Assessed (with representations): CAP determination30–45 business days
Total (best case, DTS):8–10 weeks
Total (worst case, CAP + representations):15–20 weeks

---

Recommended next steps

1. Pre-Lodgement Meeting with City of West Torrens

Action: Contact the City of West Torrens Planning Department to arrange a free pre-lodgement meeting. Bring:
  • Title deed and survey (if available).
  • Preliminary sketch plan of the proposed dwelling (orientation, setbacks, height, private open space).
  • Photos of the site and neighbouring dwellings.
Outcome: Confirm:
  • Site dimensions and assumed DTS/DPF compliance (300 m² minimum, 9 m frontage).
  • Street-setback context (existing abutting buildings' setbacks; whether 5 m default applies).
  • Tree-register check (council will confirm if regulated/significant trees are listed on or near the property).
  • Whether the subject site is state-maintained (DIT referral required?).
  • Whether the site is in a Concept Plan boundary (unlikely, but DTS/DPF 10.1 requires checking Part 12).

2. Commission an Arborist Assessment (if Trees Present)

Action: Engage an arborist to:
  • Inspect the site and identify any regulated trees (≥200 mm DBH or on council's register) and significant trees (heritage value).
  • Measure tree height, branch spread, health condition.
  • Determine Tree Protection Zone (TPZ) — typically 5–10 m radius from tree base.
  • Advise on retention feasibility and building setbacks/design modifications needed to protect trees.
  • Provide a written Arborist Report for the development application.
Outcome: Confirm that:
  • No regulated/significant trees will be harmed, OR
  • Trees will be retained with design modifications (e.g., increased setbacks, modified driveway routing), OR
  • Tree removal is justified (disease, safety hazard, site constraints) and will be Performance Assessed against PO 1.1–1.4.
Cost: $500–$1,200. Timeline: 2–3 weeks.

3. Commission a Detailed Site Survey

Action: Engage a surveyor to:
  • Confirm site area (in m²), frontage length (to nearest 0.1 m).
  • Measure existing ground slopes (gradient %).
  • Locate boundaries precisely; identify any easements or encroachments.
  • Measure existing buildings on abutting sites and their setbacks from the street (to calculate DTS/DPF 5.1 primary street setback).
Outcome: Confirm that:
  • Site area ≥300 m² ✓
  • Frontage ≥9 m ✓
  • Slope is flat or <1 in 8 (no earthworks constraints) ✓
  • Primary street setback can be determined (average of abutting buildings minus 1 m, or 5 m if no abutting context).
Cost: $1,500–$2,500. Timeline: 1–2 weeks.

4. Engage an Architect/Designer

Action: Prepare preliminary design sketches and then final architectural plans showing:
  • Site plan (scale 1:100 or 1:200) with boundary, setbacks, driveway, private open space, ancillary buildings (if any), existing trees.
  • Floor plans (ground and upper level) with room dimensions, living-room location, private open space dimensions and access, car parking location.
  • Elevations (front, rear, side) showing height (measured from natural ground level), wall height, gable end, materials, colours.
  • Sections through the site (if sloping) showing ground levels, finished floor level (FFL), height measurement point.
  • Schedule of materials (roof, walls, fencing, driveway surface).
DTS/DPF Compliance Schedule: Prepare a table (as shown in _sa-common/conditions_library.md) matching each DTS/DPF criterion to the proposal:
P&D Code RequirementProposedComplies?
Site area ≥300 m²[actual area]Yes/No
Frontage ≥9 m[actual frontage]Yes/No
Height ≤9 m[roof height in m]Yes/No
Coverage ≤60%[footprint % of site]Yes/No
Primary street setback[distance in m]Yes/No
Side setback ≥900 mm[distance in m]Yes/No
Rear setback ≥900 mm (≤3 m wall) or 1.9 m + 1/3 excess (>3 m south-facing wall)[distance in m]Yes/No
Private open space ≥24 m² with ≥3 m dimension[area in m², dimension in m]Yes/No
Car parking 1 space, 3.0–3.2 m width, 5.5 m setback from primary street[setback in m, width in m]Yes/No
Ancillary buildings ≤80 m² (site >500 m²), wall height ≤3 m[area in m², height in m]Yes/No
Cost: $2,000–$5,000 (architect) or free (owner designer, subject to council's Acceptable Design approach — check with council first). Timeline: 4–6 weeks (iterative process with arborist/surveyor feedback).

5. Prepare Development Application (DA)

Action: Lodge a complete application to City of West Torrens via the PlanSA portal, including:
  • Completed DA form (application for Planning Consent).
  • Title deed + plan of allotment.
  • Site survey (scaled, dimensions, boundaries).
  • Architectural plans (site plan, floor plans, elevations, sections, materials schedule).
  • Arborist report (if trees present).
  • DTS/DPF compliance schedule (showing which criteria are met).
  • Certificate of title (current).
  • Owner's declaration and authorisation.
Outcome: Council issues a "deemed to be received" notification (s 108 PDI Act) on day 1 of lodgement. Timeline: Application processing begins day 1 of receipt (application fee typically $500–$800 for a dwelling; varies by council).

6. Key Code Provisions to Read in Full

Applicant and planner should read and understand:

ProvisionRelevanceReading Time
General Neighbourhood Zone (GN) — Part 2Primary zoning; all built-form controls (height, setback, coverage, density, private open space)30 min
Airport Building Heights (Regulated) Overlay — Part 3Not engaged for ≤15 m dwellings, but confirm via SA Property & Planning Atlas10 min
Prescribed Wells Area Overlay — Part 3Water-supply sustainability; mains connection = DTS compliance10 min
Regulated and Significant Tree Overlay — Part 3Tree retention/removal assessment; Performance Outcome merit if trees present20 min
Design in Urban Areas — Part 4Private open space tables, car parking, decks, fences, overlooking, ancillary buildings30 min
Transport, Access and Parking — Part 4Car parking rates, driveway width, setbacks, access safety20 min
Part 9.1 — ReferralsTriggers for DIT, EPA, Heritage SA, CFS, NVC referrals15 min
Section 107 PDI Act — Seriously at Variance TestThreshold for refusing Performance Assessed applications5 min
Total reading: ~2 hours. Planner should complete this; applicant should review sections 1–3 (zones, overlays, Desired Outcomes).

7. Anticipated Conditions

If consent is granted (DTS pathway), expect standard conditions including:

  • Compliance with stamped plans (DTS/DPF 1.1 compliance condition).
  • Stormwater disposal (not to flow onto neighbours' land; Design in Urban Areas PO 5.1).
  • Sediment and debris control during construction (General Development Policies — Construction).
  • Landscape/tree retention (if regulated trees identified; Regulated and Significant Tree Overlay PO 1.1).
  • Works completion before occupation (all driveways, private open space, car parking completed).
  • Waste bin storage (Design in Urban Areas PO 20.1).
No prescribed-body conditions (Section 122 PDI Act) expected unless DIT or DEW referral triggered.

---

Summary: What to Do Now

1. Call City of West Torrens Planning (1–2 days) — arrange pre-lodgement meeting; confirm DTS pathway viability. 2. Arborist + Surveyor (2–4 weeks in parallel) — confirm site dimensions and tree status. 3. Architect/Designer (4–6 weeks, after survey) — prepare compliant designs and DTS/DPF schedule. 4. Lodgement (week 7–

Sources & legislation

Every claim in this report is grounded in the following authoritative documents. Click any link to open the in-force version directly.

  • PDI Act 2016 — Planning, Development and Infrastructure Act 2016 (SA) — Primary statute. Establishes the State Planning Commission, the Planning and Design Code, and the four assessment pathways (Accepted, Deemed-to-Satisfy, Performance Assessed, Restricted).
  • PDI Regulations 2017 — Planning, Development and Infrastructure (General) Regulations 2017 (SA) — Regulations under the PDI Act — referral triggers, prescribed development classifications, application requirements.
  • Planning & Design Code — South Australian Planning and Design Code — Single state-wide instrument. Zones, subzones, overlays and General Development Policies — gazetted under the PDI Act.
  • SA Planning Portal — PlanSA — South Australian Planning Portal — Statutory lodgement portal for development applications. Hosts the SAPPA viewer and the Code in its in-force form.
  • Part 4 — General Development Policies — Planning and Design Code Part 4 — General Development Policies — Cross-zone policies — car parking, design quality, signage, advertising, infrastructure, hazards.
  • Adelaide Airport Curfew Act 2000 — Adelaide Airport Curfew Act 2000 (Cth) — Airport Building Heights (Regulated) and adjacent overlays trigger Commonwealth airport referrals (Aviation Reference Point obstacle limitation surfaces).
  • Development Act 1993 (repealed) — Development Act 1993 (SA) — repealed — The pre-PDI Act statute. Historic approvals may still rely on it; included as a navigational reference only.

Get this report for your property

Same engine, grounded in your address’s actual planning controls.

Order your SA Residential Planning Report